Off-site improvement fees payable to the Director of Public Works shall be required as shown in Table 30.80-5.
Table 30.80-5 Fee Schedule - Off-Site Improvement Fees Administrative Service Required Fee Soil/Asphalt Review Original Application Initial Submittal
& 1 ReviewEvery Review
Over 2 ReviewsUp to 5 Acres $750 $400 Over 5 Acres & up to 40 Acres $2,000 $400 Over 40 Acres & up to 320 Acres $4,000 $400 Over 320 Acres $6,000 $400 Improvement Plan Review Original Application $300, or 1.20 percent of the estimated construction cost , whichever is greater Revision of an Approved Plan $50/sheet Off-site Plan Rejection Additional 50% of plan check fee Impact Analysis Review—Traffic Study Original Application Initial Submittal
& 1 ReviewEvery Review
Over 2 ReviewsUp to 5 Acres $750 $400 Over 5 Acres & up to 40 Acres $2,000 $400 Over 40 Acres & up to 320 Acres $4,000 $400 Over 320 Acres $6,000 $400 Optional Traffic Mitigation $750, plus $150 per trip , prior to building permits or approval of improvement plans Impact Analysis Review - Drainage Study Original Application Initial Submittal
& 1 ReviewEvery Review
Over 2 ReviewsUp to 5 Acres $750 $400 Over 5 Acres & up to 40 Acres $2,000 $400 Over 40 Acres & up to 320 Acres $4,000 $400 Over 320 Acres $6,000 $400 Inspection Fees Offsite Permit First $30,000 $300 minimum, or 2.75 percent, whichever is greater Next $90,000 1.75 percent Over $120,000 1.00 percent Encroachment Permit Appropriate plancheck and inspection fees or $300.00 minimum whichever is greater Re-inspection Fee hourly rate for each re-inspection Re-test hourly rate Bond Replacement $500 prior to release of the existing bond Bond Reduction $500 Improvement Agreement $50 Traffic Control Plan $50 Work Without A Permit 3x permit fee Structural Review $750 per 660 feet Right-of-Way Permit Violation $300 Per Hour Rate $120 Investigative Fees Hourly rate-minimum 3 hours Overtime Rate 1.5 hourly rate Flood Plain Determination $20 for each request for information as to whether or not a property is located within a Federal Emergency Management Agency defined special flood hazard area Clark County Supplement to Uniform Standard Drawings and Specifications $10 Additional Requirements:
1. As determined on the construction bond estimate form, and as approved by the Director of Public Works.
2. Resubmittal shall be required if plans do not contain sufficient information for a complete review, have been substantially redesigned, or if required corrections are not submitted within one (1) year of notification.
3. As defined in Chapter 30.52.055(b).
4. Based on the estimated construction costs as determined by the Director of Public Works.
5. Additional fees may be required to provide for overtime or night work and must be paid prior to final acceptance of the work.
Refund Policy: Per 30.80.020(b)(Ord. 3518 § 16 (part), 2007; Ord. 3296 § 10 (part), 2005; Ord. 2849 § 1, 2003; Ord. 2769 §§ 110—111, 2002; Ord. 2482 § 19 (part), 2000; Ord. 2481 § 3 (part), 2000)
(Ord. No. 3768, § 3, 5-6-2009; Ord. No. 3859, § 12, 5-5-2010)