§ 30.28.090. Minor Subdivision Parcel Map.  


Latest version.
  • Parcel maps and amended parcel maps shall be processed per Table 30.28-6.

    Table 30.28-6 MINOR SUBDIVISION PARCEL MAP - AUTHORITY AND CONSIDERATION TABLE
    a. Initiating Authority Property owner
    b. Standards for
    Acceptance
    The parcel map technical review must be approved prior to submittal.
    c. Fee $100
    d. Application Process The Director of Public Works shall verify completion of the parcel map technical review, conformance to it, and ensure all required bonds are posted and fees paid. The County Surveyor shall, following all required corrections to the map, review the map for technical survey correctness and correctness in general according to Nevada Revised Statutes. When the Surveyor is satisfied as to the technical correctness of the map, he shall transmit his approval to the Director of Public Works.
    e. Approval Authority Director of Public Works
    f. Appeal Development standards can be waived by filing an application in accordance with Table 30.16-7.
    g. Map Expiration If not recorded, an approved map shall expire at the expiration of the parcel map technical review, except that an amended map which does not add area or lots to the map shall not expire.
    h. Withdrawal A map withdrawn by the property owner shall cease its consideration.

     

    (Ord. 3549 § 5 (part), 2007; Ord. 3397 § 3, 2006; Ord. 3297 § 3 (part), 2005; Ord. 3008 § 4 (part), 2003; Ord. 2961 § 3 (part), 2003; Ord. 2769 § 66, 2002: Ord. 2741 § 5 (part), 2002; Ord. 2573 § 5 (part), 2001; Ord. 2482 § 6 (part), 2000; Ord. 2481 § 3 (part), 2000)

(Ord. No. 3768, § 1, 5-6-2009; Ord. No. 3859, § 4, 5-5-2010; Ord. No. 4152, § 4, 11-20-2013; Ord. No. 4275, § 3, 2-18-2015)